Blower Door Results and NAHB National Green Building Standard certification

COMING SOON….

We are currently finalizing certification and performance data and I will post in the coming weeks when completed!

I can confidently say though that this home will operate at least 65%  BETTER than a home built to MI Uniform Energy Code and is built to last a minimum of 100 years, with routine maintenance, by incorporating building techniques for proper water management – the biggest reason for house failure and deterioration!

If you didn’t catch it in one of my earlier posts, one of the single largest homes expenses is Heating.  This homes modeled heating costs will be only $250 annually (or roughly $20 p/month).  Pretty cool stuff!

Project Complete!

All but a few small finishing touches, and this project is done!..  and it marks our 3rd completed this year with 2 to go.  It still amazes me that we can go from nothing to a completed home in 10 weeks!  Thanks to all the great volunteers, and there were a lot of them, that helped make this home possible for the Deik family.  The partner family receiving the home, Dave and Stacie Deik, are a great family and well deserving of taking ownership of this home!  This house was very special when compared to previous projects, due to all the innovative building envelope details and the primary mini-split mechanical heating and cooling system.

To highlight the features that are unique to this Habitat home:

  • Frost Protected Shallow Foundation built with Reward ICF blocks
  • 6″ of High Density foam under thermally broken slab
  • 10-1/2″ Exterior Walls (2×6 + 4″ of exterior foam)
  • Furring strips and Rain Screen for cladding ventilation and attachment
  • 18″ Energy Heal trusses (and the first Hab home with a cathedral ceiling)
  • ERV ducted independently from conditioning ductwork
  • Ducted and non-ducted Mini-Split whole house heating/ cooling system
  • Exhaust vent in garage to outdoors with motion activation

Exterior – 6/25/12

Exterior – 6/25/12

Landscaping – 6/26/12

Exterior – 6/25/12

Exterior – 6/25/12

Mechanical Room – 6/25/12

Rheem Marathon Electric DHW

Rheem Marathon Electric DHW

RenewAire Energy Recovery Ventilator

Garage Ventilation – Motion Activated

INTERIOR PHOTOS

Kitchen – 6/25/12

Kitchen – 6/25/12

Rear Door Coat Locker – 6/25/12

Family Room – 6/25/12

Hallway – 6/25/12 (LED Lighting)

10-1/2″ wall cavity! Be-a-u-tiful !!

Mini-Split Control Center

Ducted Mini-Split supply (1 per/ bedroom)

ERV Supply diffuser (1 per/ bedroom)

Bathroom – 6/25/12

ERV Return air (1 per/ bathroom & kitchen)

ERV Return air (1 per/ bathroom & kitchen)

Stackable Washer/Dryer Combo